|

Room Slide Installation
Perhaps one of the strongest selling points of Happijac's horizontal
room slide mechanisms is the fact that they are so incredibly easy
to install, adjust and maintain. This revolutionary slide design
is so easy to install that it is rapidly redefining the room slide
manufacturing industry. Although the particular steps involved in
the installation of these slides may be greatly customized to each
specific application they are used in, The basic steps described
below are common to every case.
|
 |
Initial alignment
As Happijac Room slides come in a pre-squared frame from
the factory, it can simply be placed on the floor and squared
up with the outer wall. |
|
Bolt to the floor and outer wall
After the slide mechanism is squared off with the outer wall,
it can then be bolted to the floor and attached to the outer
wall. Support structure for the moving floor can then bee
attached to the extension rams |
 |
Fine-tune the timing
All Happijac Room slides feature the revolutionary advantage
of being able to fine tune rail timing on the fly. Simply
pull and hold the spring-loaded drive shaft to disengage the
motor and manually advance or retract the drive mechanism
of each rail independently. One turn moves the mechanism xx
of an inch. This feature allows quick compensation for misalignments
to achieve a perfect, trouble free seal with the outer wall
every time. |
 |
Hook up the wiring
The wiring may now be connected per the provided diagramed
instructions which basically consist of connecting the slide
to the power source and operation switch.
|
| |
|
|
|
|